1. USU
  2.  ›› 
  3. Programs for business automation
  4.  ›› 
  5. Production construction control
Rating: 4.9. Number of organizations: 424
rating
Countries: All
Operating system: Windows, Android, macOS
Group of programs: Business automation

Production construction control

  • Copyright protects the unique methods of business automation that are used in our programs.
    Copyright

    Copyright
  • We are a verified software publisher. This is displayed in the operating system when running our programs and demo-versions.
    Verified publisher

    Verified publisher
  • We work with organizations around the world from small businesses to large ones. Our company is included in the international register of companies and has an electronic trust mark.
    Sign of trust

    Sign of trust


Quick transition.
What do you want to do now?

If you want to get acquainted with the program, the fastest way is to first watch the full video, and then download the free demo version and work with it yourself. If necessary, request a presentation from technical support or read the instructions.



A screenshot is a photo of the software running. From it you can immediately understand what a CRM system looks like. We have implemented a window interface with support for UX/UI design. This means that the user interface is based on years of user experience. Each action is located exactly where it is most convenient to perform it. Thanks to such a competent approach, your work productivity will be maximum. Click on the small image to open the screenshot in full size.

If you buy a USU CRM system with a configuration of at least “Standard”, you will have a choice of designs from more than fifty templates. Each user of the software will have the opportunity to choose the design of the program to suit their taste. Every day of work should bring joy!

Production construction control - Program screenshot

Industrial construction control aims to ensure that the quality characteristics of the construction object comply with the standards adopted in this industry, on the one hand, and the approved project, on the other. The process of industrial construction control is quite complex and multifaceted. First of all, because different aspects of the production of a construction organization should be subject to control, namely: the quality of building materials, equipment, components, etc .; transportation and storage conditions (the properties of some building materials may change in the event of a violation, for example, of the temperature regime); technological discipline in production (each type of construction work has a prescribed procedure and rules for their implementation); the sequence of the implementation of technical processes; the scope and timing of work for compliance with the approved construction schedule; availability of production accounting documentation and the correctness of its filling; relevance and reliability of production accounting data; safety rules (for some hazardous work this is especially important), etc. A complete list of various types of production inspections, carried out on an ongoing or periodic basis in the company, is approved by the company's management and depends on the specifics of its activities. It should be noted that the process and results of such inspections should be recorded in accounting documents required by law and having a strictly defined form (magazines, books, acts, cards, etc.). The total number of such journals and accounting cards is about 250. Of course, the construction company will not control construction production according to procedures that are unusual for it. However, two or three dozen of such control forms will definitely have to be filled out. Accordingly, one can imagine the number of inspectors (hired specifically for these purposes or distracted from their main duties for the period of inspections), the amount of time spent, as well as the amount of expenses for the acquisition and storage of tons of accounting waste paper. However, in terms of accounting, modern manufacturing construction companies have an easier time than their predecessors, who worked, as they say, in pre-computer times. Now there is no need to manually keep endless records (making various mistakes, misspellings, inconsistencies, etc. along the way). In addition, many control and accounting functions can be largely automated and performed by a computer with little or no human intervention. For these purposes, there are systems for automating the management processes of industrial enterprises. The Universal Accounting System represents its own software development that provides automation of business processes and accounting procedures in construction production, as well as contributes to the optimization of daily activities in general and to increase the return on the use of resources. To manage production control, the program provides appropriate modules containing all the necessary regulatory requirements, building codes and regulations, reference books, etc. Templates for magazines, cards, etc. forms are accompanied by detailed samples of correct filling. The system will not allow to generate and save in the database an incorrectly filled document and will give hints on the error and ways to correct it.

The control of construction production is an indispensable element of the management process in any company operating in this industry.

The USU contains all reference books, industrial norms and rules, legal requirements, etc., necessary for quality management.

The use of the Universal Accounting System allows you to automate organizational processes, accounting and control as much as possible, and also ensures the rational and economical use of resources.

Who is the developer?

Akulov Nikolay

Expert and chief programmer who participated in the design and development of this software.

Date this page was reviewed:
2024-11-21

This video is in Russian. We have not yet managed to make videos in other languages.

The program contains templates for all documents that record the results of production control.

For the convenience of the user, the system includes samples of the correct filling of all types of accounting and control documents for the production of work.

Standard forms can be generated and printed by the program automatically.

The built-in verification mechanisms do not allow storing incorrectly filled production journals, books and cards in the database.

When starting the program, you can select the language.

When starting the program, you can select the language.

You can download the demo version for free. And work in the program for two weeks. Some information has already been included there for clarity.

Who is the translator?

Khoilo Roman

Chief programmer who took part in the translation of this software into different languages.



The system highlights filling errors and gives tips on how to fix them.

For the convenience of users, the manufacturer can carry out additional configuration of all parameters, taking into account the specifics of the client company.

All divisions of the enterprise, including remote production sites, warehouses, offices, etc., within the framework of the USS are combined into a common information space.

Thanks to this, the exchange of working data takes place very quickly, urgent tasks are discussed and solved, and a common opinion on important issues is developed.



Order a production construction control

To buy the program, just call or write to us. Our specialists will agree with you on the appropriate software configuration, prepare a contract and an invoice for payment.



How to buy the program?

Installation and training are done via the Internet
Approximate time required: 1 hour, 20 minutes



Also you can order custom software development

If you have special software requirements, order custom development. Then you won’t have to adapt to the program, but the program will be adjusted to your business processes!




Production construction control

The automated warehouse subsystem provides accurate accounting and full control of stocks at all stages of their use in production, including incoming quality control when receiving goods.

The program provides for the possibility of integrating special equipment (scanners, sensors, terminals, etc.), allowing you to promptly accept production products, correctly place them taking into account the requirements for storage conditions, quickly carry out inventories, etc.

The built-in scheduler allows you to quickly adjust the system settings, plan the production of work, create a backup schedule, etc.

By an additional order, the system includes mobile applications for customers and employees, allowing you to quickly solve work tasks, effectively manage construction production from any workplace.